What are the proposed bond projects
for each school?

Dallas School District
Proposed Bond Projects

If passed by voters in the May 2022 election, the proposed bond measure would fund projects at every Dallas school.  This map shows a partial list of proposed projects by school that would be funded.

If the bond measure does not pass, the proposed projects would not be completed.  
Dallas - Bond Map_22-02-17 (1).jpg
If passed by voters in the May 2022 election, the proposed bond measure would fund proposed projects at the sites listed. 

If the proposed bond measure does not pass, the proposed projects would not be completed. 

Lyle Elementary
School

  • Replace rusted out domestic water pipes

  • Repair & upgrade HVAC components

  • Steam line replacement

  • Boiler room replacement

  • Replace HVAC Ventilators

  • Replace lighting w/LED and controls

  • Roof replacement at main gym

  • Dry rot repair

  • Repair existing covered play structure

  • Technology upgrades

  • Add secure vestibule entry, replace main entry doors

  • Reconfigure parking lot, front entry, & parking loop

  • Add/upgrade personal learning environments (PLE's) and Special Education rooms

Oakdale Heights Elementary
School

  • Replace rusted out domestic water pipes

  • Repair& upgrade HVAC components

  • Add security and lock-down keyless entry

  • Technology upgrades

  • Add/upgrade Personal Learning Environments (PLE's) and Special Education rooms

Whitworth Elementary
School

 

  • Replace rusted out domestic water pipes

  • Repair & upgrade HVAC components

  • Technology upgrades

  • Dry rot repair

  • Add secure vestibule entry

  • Add parking north of school building, site reconfigure

  • Add/upgrade Personal Learning Environments (PLE's) and Special Education rooms

LaCreole Middle
School

  • Replace rusted out domestic water pipes

  • Repair & upgrade HVAC components

  • Replace fire alarm system

  • Replace lighting with LED and controls

  • Re-roof the gym

  • Technology upgrades

  • Reconfigure main office, add secure vestibule

  • Kitchen, servery and stage renovation

  • Additional gym

  • Add access & parking lot for gym building (above)

  • Add/upgrade Personal learning Environments (PLE's and Special Education rooms

  • Replace rusted out domestic water pipes

  • Repair & upgrade HVAC components

  • Dry rot repair at interior beams, exterior canopies

  • Roof replacement

  • Sidewalk replacement to mitigate heaving issues

  • Provide safety improvements to grandstand

  • Technology upgrades

  • Add secure vestibule entry

  • Renovate existing CTE Space

  • Upgrade equipment in Bollman Auditorium

  • Renovate Small Theater

  • Resurface tennis courts & improve drainage

  • Renovate student commons area 

  • Add/upgrade Personal Learning Environments (PLE's) and Special Education rooms

Morrison Campus/
District Office

  • Replace rusted out domestic water pipes

  • Repair & upgrade HVAC components

  • Replace steam lines

  • Dry rot repair

  • Replace lighting w/LED & controls

  • Technology upgrades

  • Relocate District Office entry, add secure vestibule at entries

  • Accessibility renovation/upgrade of existing restrooms